Hallmark Refining Corporation
Hallmark committed to turning waste into profit
Address: 1016 Dale Lane
Mt. Vernon, WA 98274
Toll Free: (800) 255-1895
Phone: (360) 428-5880
Fax: (360) 424-8118
Back to Products

Mark 2 Silver Recovery System

Mark 2 Silver Recovery SystemOperations Manual

The Mark 2 is an excellent PRIMARY recovery system for film only or paper only Mini Labs generating up to 5 gallons per day of silver bearing waste. The compact size (18” x 18”) with the two column system makes the Mark 2 ideal for small volume labs. The columns desilver C-41, RA-4 (CP 47 and SM), E-6, R-3, B&W, Litho and X-Ray processing effluent.

Key Benefits
Specifications
Dimensions:18"L x 18"W x28.5"H
Processing Rate:42 mL/min (.6 gallons per hour)
Holding Tank Capacity:3.5 gallons (13L)
Processing Capacity:4-6 gallons/day (15-25L/day)
Electrical Requirements:115 VAC, 5 amps
Silver Discharge Level:Less than 1 ppm (mg/L)